header

Do you need to incinerate your waste perfectly? Do you run a hospital, laboratory, chemical or other hazardous operation? Contact us:  phone: +420 602 292 087  email: 

References

We present only a basic overview of the most important implemented projects. Contact details for references are available on request (in accordance with the General Data Protection Regulation, so-called. GDPR).


Click on the map to see more references.

SUCEAVA (Romania)
  • customer: S.C. MONDEKO s.r.l.
  • application: hazardous waste
  • capacity: 2x 2.400 kg/day
  • material scope of works: supply and installation of two refurbished incinerators GG 14
  • financial scope of works: 6 500 000,- Kč
PRAHA MOTOL (Czech Republic)
  • customer: Motol University Hospital
  • application: hospital waste
  • capacity: 2x 1.560 t/year, 2x 1,5 MW warm water
  • material scope of works: supply, installation and commissioning of two incinerators GG 14+
  • financial scope of works: 64 000 000,- Kč
ZNOJMO (Czech Republic)
  • customer: Znojmo Hospital
  • application: hospital waste
  • capacity: -
  • material scope of works: supply and installation of flue gas cleaning system and continuous emission monitoring for the incinerator GG 14
  • financial scope of works: 14 934 000,- Kč
BOJNICE (Slovakia)
  • customer: Hospital & Polyclinic Bojnice
  • application: hospital waste
  • capacity: 1.200 kg/day
  • material scope of works: supply and installation of GG 7 incinerator with flue gas cleaning and dioxin filter, continuous emission monitoring
  • financial scope of works: 56 987 000,- SK
NITRA (Slovakia)
  • customer: Hospital & Polyclinic Nitra
  • application: hospital waste
  • capacity: 1.200 kg/day, 3x 2,5 MW warm water, 2x 1,6 t/hour steam
  • material scope of works: supply and installation of warm water and steam boilers and GG 7 incinerator with flue gas cleaning and dioxin filter, continuous emission monitoring
  • financial scope of works: 44 942 000,- SK
MARTIN (Slovakia)
  • customer: Martin University Hospital
  • application: hospital waste
  • capacity: 1.200 kg/day, 5 t/hour steam
  • material scope of works: supply and installation of steam boiler and GG 7 incinerator with flue gas cleaning and dioxin filter
  • financial scope of works: 49 742 000,- SK
TOBELBAD (Austria)
  • customer: Rehabilitation Clinic Tobelbad
  • application: hospital waste
  • capacity: -
  • material scope of works: supply and installation of GG 14 incinerator with dry flue gas cleaning and dioxin filter, continuous emission monitoring
  • financial scope of works: 17 900 000,- ATS
POVAŽSKÁ BYSTRICA (Slovakia)
  • customer: Hospital & Polyclinic Považská Bystrica
  • application: hospital waste
  • capacity: -
  • material scope of works: supply and installation of GG 7 incinerator with flue gas cleaning and dioxin filter, reconstruction of the heating system
  • financial scope of works: 39 647 000,- SK

HW INCINERATOR